Ayushi's Project
Here's the Work Breakdown Structure (WBS) in table format:
WBS Level Task Subtasks 1 Project Initiation 1.1 Define project scope and objectives - Outline overall project goals- Define success criteria 1.2 Identify stakeholders - List internal and external stakeholders- Establish communication channels 1.3 Set project timeline - Define milestones- Allocate deadlines for each phase 2 Game Design Phase 2.1 Develop quiz game concept - Define game flow (start, questions, score screen)- Decide on game type (e.g., multiple-choice) 2.2 Design user interface - Wireframe the interface (question display, answer selection)- Design visual elements 2.3 Create question bank - Write a pool of questions- Categorize questions (difficulty, topic) 3 Game Development 3.1 Implement question logic - Develop question display logic- Ensure smooth transitions between questions 3.2 Program answer validation - Define correct/incorrect answers- Implement answer feedback 3.3 Integrate user interface with game logic - Connect interface to back-end systems- Ensure smooth navigation through the game 4 Testing and Quality Assurance 4.1 Conduct functional testing - Test each game feature- Ensure proper user interaction 4.2 Verify answer validation - Check that answers are correctly marked- Ensure feedback appears immediately 4.3 Debug any issues - Address bugs from testing- Conduct regression testing 5 Score Evaluation Feature 5.1 Develop scoring algorithm - Define score rules (points per correct answer)- Implement bonus/penalty logic 5.2 Calculate and display user score - Track score throughout the quiz- Display final score at the end of the game 5.3 Determine correct and incorrect answers - Maintain a list of correct answers- Display score breakdown (correct vs. incorrect) 6 Finalization and Deployment 6.1 Implement final changes based on feedback - Adjust design/functionality based on testing feedback- Resolve any issues from testing 6.2 Prepare for deployment - Optimize performance (e.g., load times)- Package game for deployment (e.g., web, mobile) 6.3 Launch quiz game - Deploy to live environment- Ensure game functions correctly post-launch 7 Post-Deployment Evaluation 7.1 Gather user feedback - Use surveys or reviews to collect input- Monitor user interactions to identify issues 7.2 Analyze performance metrics - Track engagement metrics (e.g., session length)- Evaluate scoring system effectiveness 7.3 Identify areas for improvement - Prioritize updates based on feedback- Plan for future iterations or feature enhancementsThis table structure breaks down the tasks and subtasks into a clear, organized format that will be helpful for tracking project progress.