Create Dynamic Line of Balance or 3D Gantt Chart using Excel Charts ! Innovative project Management.

teacher avatar Amey Vidvans, Education and Technology Enthusiast

Watch this class and thousands more

Get unlimited access to every class
Taught by industry leaders & working professionals
Topics include illustration, design, photography, and more

Watch this class and thousands more

Get unlimited access to every class
Taught by industry leaders & working professionals
Topics include illustration, design, photography, and more

Lessons in This Class

    • 1.

      Overview of LOB and 3D Gantt charts

      1:46

    • 2.

      Anatomy of 3D Gantt Chart

      8:20

    • 3.

      Create 1st line of Balance

      6:30

    • 4.

      Understand Data points for LOB

      5:48

    • 5.

      Data Set up for Commercial Building for 3D Gantt chart or LOB

      2:48

    • 6.

      LOB commercial - Add first series

      7:24

    • 7.

      Position data points in space along with building

      7:13

    • 8.

      How to add more data and format

      6:20

    • 9.

      Make it visually Appealing

      4:54

    • 10.

      Finish 3D Gantt charts and Read the data

      7:52

    • 11.

      Prepare Linear or Align based schedule

      10:24

    • 12.

      Prepare LOB for a Skyscraper

      6:09

    • 13.

      3D Gantt chart for the Skyscraper

      9:39

    • 14.

      Add Dynamic milestones

      7:23

    • 15.

      How to show dates for any specific level

      8:00

    • 16.

      How to show procurement dates on the same chart

      8:50

    • 17.

      Line of Balance - Basics of Balancing

      5:18

    • 18.

      How to Balance Activities?

      5:14

  • --
  • Beginner level
  • Intermediate level
  • Advanced level
  • All levels

Community Generated

The level is determined by a majority opinion of students who have reviewed this class. The teacher's recommendation is shown until at least 5 student responses are collected.

76

Students

--

Projects

About This Class

Learn to create Dynamic 3D Gantt charts and Line of balance using Excel charts and formatting techniques, No codes, No macros

First such course  !!! No need to go scrolling through pages. Learn to put all the critical information on a single page.

3D Gantt chart is just the next big step into project management.

Remember scrolling through numerous pages reviewing the schedule?

With 3D Excel Gantt charts, you can review all the critical information on a single page instantly, giving a complete picture of the project in one go. In addition, it accurately captures the position of a task against a timeline and in space, thereby providing an invaluable understanding of the project.

what is a 3D Excel Gantt chart -

A typical Gantt chart is a representation of activity position only against time. A 3D Gantt chart accurately captures the place of each activity against time and space.

Moreover, you can use different formats and pictures to present critical the information in the most visually appealing layouts. And remember, it's all dynamic—any changes you wish, get instantly reflected for comparison.

Advantages of a Gantt chart-

  • Gantt charts create a stunning visual image of a project schedule.
  • Graphical nature makes it relatively easier to read.
  • The ability to represent critical information on a single page gives a far better understanding of the project.
  • 3D Gantt chart is a great technique and, when combined with the project schedule, gives excellent control over the entire project and different processes.

For these reasons, 3D Gantt charts are invaluable in reviewing any Project Schedule.

The ideal student for this course - 

The ideal student for this course is the one who works with the task lists or activities regularly. It is beneficial for a project manager, a construction manager, a project engineer, a vendor, a contractor or a coordinator to manage projects efficiently.

What are the primary requirements if you wish to undertake this course?

All You need is basic knowledge of excel, a willingness to learn new things and an open mind. 

Post-purchase support: Complete support and assistance are available for you, no matter your project's stage. I would love to see you use this innovative tool regularly.

Meet Your Teacher

Teacher Profile Image

Amey Vidvans

Education and Technology Enthusiast

Teacher
Level: Intermediate

Class Ratings

Expectations Met?
    Exceeded!
  • 0%
  • Yes
  • 0%
  • Somewhat
  • 0%
  • Not really
  • 0%

Why Join Skillshare?

Take award-winning Skillshare Original Classes

Each class has short lessons, hands-on projects

Your membership supports Skillshare teachers

Learn From Anywhere

Take classes on the go with the Skillshare app. Stream or download to watch on the plane, the subway, or wherever you learn best.

Transcripts

1. Overview of LOB and 3D Gantt charts: Let's learn to prepare amazing 3D Gantt charts. My name is Amir, and I will take you through this course. I'm an education and technology enthusiasts. I have been working in project management with a total experience of 17 years. Fortunately, I got an opportunity to work and learn on iOS projects such as special economic zone, IT, commercial, residential, hospitality and infra. Since last few years, I was working on how to effectively communicate critical project information to different stakeholders. I've worked on numerous format and then came across this innovate build 3D Gantt charts. 3d Gantt chart is a great way to visualize a project schedule which provides powerful insights about your project for analysis and better decision-making. Promise simple activity to preparing a stunning comprehensive visual reports, this course provides necessary knowledge, tools and techniques which can be easily applied for different types of projects, such as commercial, high-rise, roads and bridges. Only basic Excel operating skills are necessary as we will learn to prepare all these reports using Excel charts and few formatting techniques. There are no courts Macros. This course will certainly provide you with the important upgrade to your knowledge and experience. It will enhance your visualization and we'll prove vital in personal as well as professional development. Please go through the course description. Quite excited to see you add this amazing tool to your diverse knowledge portfolio. 2. Anatomy of 3D Gantt Chart: Before we actually start preparing pretty Gantt chart, it is necessary to understand charts and decode various chart elements. It will help you not only for this course, but in case you want to use charts for other purpose. This area, It's spreadsheet area. These are various commands. Commands are segregated in different groups. Every group contains commands of similar characteristics. This area where all the commands are available is called as a ribbon. These are different tabs which contain different commands under each. Let's try to understand charts. First, select the cell range, which contains dates. Go to Insert tab. There is a group called as charts, where different charts are available. When you take your cursor or any element. As in our case charts, excel gives a description of each. Here you have different jars available. We will use scatter chart. There is a small arrow. It means there are few more charts available under that option. Let's click on it. Select scatter chart. You will have one chart inserted. There are small circles I will label at the corners and centers of each side, which help us resize the chart. We use a chart to represent certain information of facts which is called as data. If we want to edit the data, select the chart and right-click. When you right-click on the chart or any of the chart element, we get a mini toolbar and chart Min new Vitruvian commands, which are most commonly used with that selection. Over here we are discussing about the data. Hence, click on Select Data. Let's select data source dialog box will appear. Here. You will find one of the series captured already. To make changes in that series, you need to select the series and click on edit. To add more data or more series. You have to click on Add. Select the series, and click on Edit. It will display an edit series dialog box. There are three value boxes. First value box is the name of the series. Next to value boxes are very important for us. As discussed, we need to take activity dates and x-axis respect to floor height on the y-axis. This step is very important in the entire course, you need to select activity dates on x-axis and fluid levels on y-axis. Let's explore a few more options. When you select the chart. On the right-hand side, there are more options available. On top, you'll see a plus sign, which help you add or remove different chart elements. When you click on the plus sign or chart elements, it presents number of chart elements to add. Elements would checkboxes checked are already added to the current chart. When you move your cursor over a different chart elements, it presents preview of this elements on the chart to help you visualize the effect. Let's add a few elements. Add excess title using the checkbox. Add data labels. Had legions. When you take your cursor over any of the elements, one arrow appears on the right-hand side. It means there are a few more options I will label under that particular chart element. Let's take the GSA on the grid line and click on the arrow. If you observe we have two checkboxes checked. One is primary vertical and second is Primary Horizontal. Now let us discuss how to edit Chart and chart elements. When you take your cursor over a different chart elements, excel describes the element instantly. So it becomes easier to select a particular element. Move your cursor over various areas to understand them. First, chart area, plot area, lesions. Axis. Title. First Format Chart Area. Thank your cursor over the chart. When the Excel displays chart area selected by left-click board to format and change the fill off your choice. Similarly, select the plot area, change the field. You can change the outline as well. In the same fashion. You can format various chart elements that are added in the chart. Let's explore another way. Select any Chart Element and right-click so forth. I mean, we will select horizontal axis by left clicking. And I right-click. Click on Format Axis. On the right-hand side, you will get a task pin. We have selected format axis. All the options that are related to the format axis will be available on the task pen. First one is access option. Second, Size and Properties. Effects. Fourth is Phil and line. Click on Axis option. There are more formatting options. I will label. Just click the arrow and you use scrollbar. Now, let's discuss two options which we will be using very frequently. Under bounds. You will how to value boxes one for a minimum and other for maximum. It will define the start and end of our project timeline. We can directly enter data in this value boxes. Under units you how to value boxes, which would be fine. Holder timeline is formatted. If you reach to her daily interval, you how to enter one in measure and if you weren't weekly interval, you how to enter seven. Just play around with various options. Similarly, you can add chart elements from Design tab, chart layout groups. Click on the arrow near Add Chart Element. There are various options available under each one. This tutorial, it just to give you idea of chart and various chart elements which we will be using often throughout this course. We will start working on it from the mixed tutorial. Thank you very much. 3. Create 1st line of Balance: Hello. In this tutorial, we will see how to create a 3D timeline or 3D Gantt chart, which will act as a stepping stone for our future projects. Typical Gantt chart audit timeline has only one value access to shoot any numerical data. It becomes very difficult to plot data points which contains two numerical attributes. Scatter chart always has to value axis to show one set of numerical data along a horizontal axis and another set of numerical values along vertical axis and that is y-axis. The chart displays point at the intersection of X and Y numerical value. Further combining these values into a single data point. We are going to create, overthink simply using scatter charts. Now let us see how to use scatter chart to create our first 3D timeline. Let's refer some simple data. Here we have floor wise finish dates of structural word. Select Finish dates and go to Insert tab. Charts group. Under Insert Scatter or bubble chart. Select scatter with straight lines and markers. We will see a scatter graph created. No absorbed the chart. Here we have dates on y-axis and floors on x-axis. As we know, Gantt chart represents the information against time. We need dates on x-axis and floors on y-axis. Right-click on the chart area. We will get context menus. Click on Select Data. Select beta source dialog box will appear. On top. We have data range for the chart. Left-hand side, we have series. Now remember this is the area where we will put our activities. On the right-hand side, means under horizontal axis labels we have floors. As we heard, discussed, or lady, we want finish dates on horizontal axis means we need to edit the data for the series. Hence select the series. Click on edit and edit series dialog box will appear. Here you will see three value boxes to enter the data. First we are Lubac says Siri's name under which the data is already captured. This value box just defines column header on name of the activity. Second value boxes series x-value walks. We wanted to show floor row-wise finish date for each activity against aim. And hence we need to select Finish dates in x-axis while loop box. Hence select cell range containing finished it. Let's move to cities while loop box. It will define height or floors in our Gantt chart. Hence select floors from the data. Click Okay. Now you will see a graph created. No, we will format the chart a bit. First, we will format x-axis. Let's select x-axis. Right-click, and select Format axis. We will get a task pane on the right-hand side. Under access options. Good to bounce. Here we have minimum and maximum. It defines the range of dates or boundaries of our timeline. We weren't timeline from 13, January 18 to 18, August 18. You can change the dates also. Type these values in the minimum and maximum. Minimum. Third been January 18. Maximum eight been August 18. Now let's change the scale to seven. Under measure units. To save in. Here we haven't taken weekly interval, the number. Select category as dead, and select as bait and Mn, VB MMM. Let's change the alignment of the labels to make them properly visible. Click on Size and Properties. Under alignment. Select, rotate all takes to 70 degrees. Now if the labels are still not visible properly and just select the plot area and they resize it. Here we added one series and we started some formatting work. We will continue in the next tutorial. Thank you. 4. Understand Data points for LOB: Hi, welcome back. We will continue from where we had left. In the last tutorial, we added one series and we formatted x-axis. We will format y-axis also, that is where vertical axis. Click on y-axis and enter one. Measure unit while loop box. Now we will add data labels. So select the series. Click on Chart Elements, which is on top right of the chart. Elements. Select Data Labels. Let's format data labels as well. Select Data Labels. Check X value as well. Expel humans finished it. Absorbed the chart we have completion date of specific floor or in the detail label. Let's format the chart a bit. Select the chart. Go to Design tab. Under Chart style. Change the style of your choice. Here I will select style nine. Now we are building our chart here. Let's add another activity in our chart. Right-click on the chart again. We will get context menus. Click on Select Data. The Select Data Source dialog box will appear. We already have one series in our chart. We need to add another series which contains finish dates for second activity. Hence, click on Add under a series name. Select silicon tending column header mesentery under x-value box, select Finish date for that activity. In series y-value box, select cell range containing floors. Click Okay. You will find another line added to our chart. Let's add data labels to this series as well. Select the series. Click on Chart Elements. Elements, Select Data Labels. Let's format the data labels. Select labels. On the right-hand side, check x-value as well. Here our basic graph is ready. You will find lines passing through each data point. As we have already seen, each data point is at the intersection of its position on x-axis and y-axis. Each data point is at the intersection of its position with respect to the finish date and the particular floor level. Hence, when you take the mouse pointer over any of the data point, it shows its position along both the axis. It tells you finished it. The floor under consideration as well. Further, you will absorb certain slope for this line. This slope represents production rate for that particular activity. For this timeline. You absorb the second activity with respect to the first activity. Say activity also follows first one with the identical slope. We can say that production rates for both the activities are balanced in this case. That's all for this tutorial. In this tutorial we created a symbol 3D Gantt chart or line of balance using scattered chart for two activities. Some important points to remember, only two value boxes there it is x-axis while loop box and y-axis value box defines the graph or designs the graph. We wanted to show activities against Spain. Hence, we selected dates in x-value box, means we selected finish dates in x-value box. We use Why? Well, Lou box to represent floor level or height. Whenever we are using lineup balance charts, we will select dates in x-axis while loop box and floor label our height in y-axis value box. This tutorial will help a lot to build further reports. In the next tutorial, we will prepare line of balance sharp for a commercial project. Thank you very much. 5. Data Set up for Commercial Building for 3D Gantt chart or LOB: Hello. In this tutorial, we will see how to create line of balance chart or a low bar chart, or a 3D timeline or 3D Gantt chart for a commercial project. Here we will go one step ahead. For a typical project, generally, floor hate doesn't remain constant throughout the building. That is, if you absorb the section of the building, we have used certain sets of floors are different heights. For example, basements, parking. How different heights? Office floors may have a different height than parking floors. Structure about terrace has different height. Know when we try to represent the lines with respect to each floor, it creates a problem because of variable heights. But there is a very easy solution. Or rather we can say there is a very simple trick which helps us a lot in our further reports. Also, in this tutorial, we will learn very interesting thing how to create a perfect graph for variable height of floors. So that data point for that particular floor exactly matches the floor level under consideration. Once you learn the simple trick, you will be easily able to create amazing 3D timelines or line of balance charts for any current of the building which contain any kind of height four floors. Now let's see how to use scatter chart to create a 3D timeline. Let's refer the data. Here is the data for a commercial building. A typical commercial building contains many areas as parking floors and office floors with different heights. In the first column, we have floor to floor height. In the second column, we have lower levels of the building. Third column contains designation of Florida. Next columns and ten activities and late finish dates for respect to floors. Here I heard they can finish their itself only few selected floors to make the chart little easy. We can plot date for activity and every floor also. 6. LOB commercial - Add first series : We will begin creating the chart. Let's go step-by-step. First, we will enter the chart. Select Finish dates with column header. Go to Insert tab charged group. Under Insert Scatter or bubble chart. Select scatter with straight lines and markers. We will see a scatter graph created. Let's resize, increase the size of the shot. First, we will format the chart. Absorb the chart. Here we have dates on y-axis and floors on x-axis. Whereas we weren't dates on x-axis and floors and y-axis. So that chart replicates the building. So we'd do the same thing as we did in the last tutorial. Right-click on the chart area. Click on Select Data. Select the series which is already added. And I click on edit. And edit series dialog box will appear. We don't need to change anything in series name. Rarely box as the column header is already captured or the name of the activity is already captured. In series x-value box. Select Finish dates for structure. In series YOLO box. Select levels from second column. Click Okay. Our chart with one series is ready. Let's format the chart. Move the chart. If you will absorb the chart, you will find points below x-axis. Also know these dates represent finished date for basement floors. We will format axis, select x-axis, right-click, and select Format Axis. Under abounds in minimum fire, June 17, in maximum fire, December 19. Now here the timeline is large enough, so we will take monthly interval. There is inconsistency in days, months. How over the year? Like few months contain 30 days, whereas few contain 31 days. Do this. We will use 30.5 units. Let's put 30 value as measure as well as minor unit. Under labeled position. Select low. Go-to number. Under Category. Select Date. Under type, select month and year. Mmm, YY. We will change the alignment of label to make them properly visible. Click on Size and Properties under alignment, open various options for ticks alignment and select, Rotate alt-text to 70 degree. The labels are still not visible properly. We can select plot area by clicking on the chart and the resizing it. Select Y-axis, right-click and select Format Axis. I was on the floor levels. Here we held minimum as minus 8.7 and maximum as API 0.3. We will use these values under major and minor units. What do we don't want a y-axis on the chart. Hence, click on the chart. Under Chart Elements under axis. Unchecked, Primary Vertical X. Let's add data labels to the series. Select the series. Click on Chart Elements. Elements, selecting data labels. Now let's format the data labels. Select Labels. Format Data Labels. Task pane will appear on the right-hand side. Under Label Options. Check x-value and uncheck y-value. What it means we are showing only finished it and we're not chewing height or fluid. Know when you absorb the chart we help completion date of specific floor in the data label. We will change the alignment of the label. Hence, click on Size and Properties under alignment. Select text direction. Rotate to 70 degree. Let's change the font to Arial and decrease the font size to eight. Let's remove horizontal grid lines. As we will use buildings section to highlight the floor. Click on Chart. Under Chart, Elements, under grid lines. Unchecked primary measure horizontal grid lines. In this tutorial, we saw how to create a 3D timeline for a project and how to how data point exactly in front of that respect to floor, taking into account floors with different heights. Next tutorial, we will add image of the building so as to make the presentation fairly easy to understand and to communicate in a better manner. Thanks a lot. 7. Position data points in space along with building: Hello, Welcome back. In this tutorial, we will see how to add an image and match dates with respect to floors in a building section, you endo floor height is not constant throughout the building. Go to Insert tab under Illustrations group. Click on Picture. Select the image from the location and click on insert. An image will be inserted. Now select the image and reposition it. Just the size of image. Just the size of chart area and plot area if needed. Moody image about the chart. Just resize it. Right-click on the image and send the image backwards. Select Chart Area. Go to Format. Under Fill. Select no fill. The outline, select no outline. Now align the chart so that basement data point matches best men floridly well in this section, now believe the title. Add just the chart area and broad area to match individual floor data points. It may take a minute or so. Display around. You can resize the image also if you need. But remember to not to change the aspect ratio. Most select x-axis. Make it bold. Increase the font. Change the font color, the orange. Select what it picker grid lines and change color to orange. And select squared a dot. Now let's add legions. Click on the chart. Under Chart Elements under lesions. Click on More Options. In the task pane on the right-hand side. Under the lesion options. Legion position, check left. Unchecked, showed the lesion without overlapping the chart. Select the series under fill in-line, change line color to purple accent. Click on market. Under Fill, select solid fill. Orange color. Under border. Select solid line. But upper color. Select Data Labels, and change their color to purple accent. Here you will easily find finish date of respect to flow or just by pressing along the grid line. Let's say we want to know the finish date for terrace level price along the grid line and check the data point you will find 16, August 18 is the finish date for RCC Paris level. Now, RCC completion babies Greenpeace, September 18. Moreover, if you take mouse pointer over the top wine for any floor, it will give you floor level and finished it absorbed the data. Suppose you want to know RCC finish date for 14 floor, which is at 60.05 meter floor level. Now we will take mouse pointer over the data point. When you take your mouse pointer or the data point, it will display a box. First value gives you a finish date, and second value gives you floor level. Let's check the date with respect to the floor level, 60.05, you hence 14 floor assets if finished date is 28, June 18. Know how we can draw some inferences or conclusions by absorbing the chart. When you look at the data points, we have around two data points in a month on an average for typical floors means four floors between first floor and Data Explorer. We can easily say that RCC productivity is two floors per month, or we're casting two slabs in each month. So roughly overflow, it takes 15 days for RCC completion. This kind of conclusions you can easily draw by observing the chart. Because of graphical nature, LOB is very easy to read, visualize, and analyze in comparison to conventional Gantt charts. The inferences help a lot to plan, cross-check, and reschedule construction processes like procurement and inventory management, cashflow and execution. We will go in detail in next tutorials. Next tutorial we will add few more activities and will develop line of balance sharp for a typical floor commercial project. Thank you. 8. How to add more data and format: Hello. In last tutorial, we plotted one series and added an image to improve visualization. In this tutorial, we will learn how to plot few more activities. We will make it more interesting. We will learn how to represent activity finish date for different flows as well. Please absorb the chart which contain dates. Here column header represent activity names. We will show a few activities start from first floor and finish at 16 floor. At initial level. Might elevator work starts from leaf machine room and finish at lower best men. I hope but oppositely used finish dates for different floors so that you will understand the logic behind it and you can easily plot it for any given situation. Let's add another activity of sand blaster. For this activity, we will use finish date for first floor and 16 fluid. Right-click on the chart area. We will get context menus. Click on Select Data. Select Data Source dialog box will appear. On the left-hand side, you will find one series already selected. Here we will add another series. Hence click on Add. Under a series name Value box, select the cell which contain name of second activity, that is sand plaster. In series x-value box. Select dates for sand blaster. So click inside x-value box and select Finish dates. Select Finish date for first floor. Insert coma. Then select Finish date for 16 floor. Here we are entering the values in a different way. Let's move to cities, Wyman blue box. Here we will enter floor levels, select the cell containing first floor level. Insert coma. Then select the cell containing 16th floor level. Here is that you can draw a line in between any two or more floors by selecting Finish dates and heights for those with respect to fluids separate by comma in x-value box and white box respect to. Click. Okay. You will find another line is created. Let's format this. Select the series under fill in line. Change the line color to green. Click on marker. Under field, selecting green color. Under border. Select solid line green color. Go to Chart Elements. Click on Data Labels. Now select data labels. Under Label Options, check x-values and uncheck y-values, as we will add only finished it. Select Label Position left. Change their field to green. Change foreign color to black. Make the font bold. Reduce foreign size. Let's add another activity of waterproofing world. Right-click on the chart area. Click on Select Data. Click on Add. Under a series name Value box. Select the salvage contain name of the activity, waterproofing. In x-value box. Select Finish date for the first floor. Insert coma, then select Finish date for 16 floor. Similarly, in series y-value box. Select the cell containing first floor level. Insert coma. Then select the cell containing 16 floor level. Click OK. Now format the series. Select the cities under fill in-line, change line color to blue. Click on the marker. Under Fill. Select blue color. Under Barter. Select solid line blue color. While the series is selected, go to Chart Elements. Click on Data Labels. Select Beta labels. Right-click. Click on Format Data Label. The task pane. Under Label option, check x-value or uncheck wire loop. Click on Size and Properties. Under alignment, x-direction, click on the rotate alt text to 70 degree. Most Select Data Labels. Change their field to Blue. Change foreign color to white. Make the font bold, reduced the foreign size. We will continue in the next tutorial. Thank you. 9. Make it visually Appealing: Hi, welcome back. We will continue from where we had left. Let's add another activity of piling work. Right-click on the chart area. Click on Select Data. Click on Add and better Series Name Value box. Select the cell which contains name of the activity tiling. In x-value box. We will select date for tiling. Select finished it for first floor. Insert coma, select Finish date for 16 floor. Similarly in series y-value box, select cell containing first floor level, insert coma, then select the silicon tanning 16th floor level. Click Okay. We have added another line. Select the series. Under fill line, change the line color to orange. I click on marker. Under Fill, select orange color. Under Barter. Select solid line orange color. Select the series and go to Chart Elements. Click on Data Labels. Now select data labels. Under Label Options. Check x-values and uncheck y-values. Click on Size and Properties. Under alignment. Thanks direction. Click on rotate alt-text to 70 degrees. Select Data Labels, change their field to orange and change font color to black. Make the font bold. Reduce the font size. Let's add another activity. False ceiling would right-click on the chart area, click on Select Data. Click on Add. Under series name or Lubac. Select the cell containing name of the activity false ceiling. In x-value box. Select dates for false ceiling word. Select Finish date for first floor. Insert coma, then select Finish date for 16 floor. Why we're Lu box. Select floridly wells. First floor. Insert coma, then cell containing 16 floor level. Click Okay. You will find another line is created. Select the series under fill in-line, change line color to light-blue. Click on marker. Under Fill, select light blue. Under Barter, select solid line, light-blue. Let's format this. Select the series, go-to chart elements. Click on Data Labels. Select data labels. Under Label option, check x-values, and uncheck y-values. Select Label Position. Click on Size and Properties. Under alignment. X-direction, click on the rotate alt-text to 70 degrees. Select Data Labels, change their field to light-blue. Change foreign color to black. Make the font bold and reduce the foreign size. In this tutorial, we have created a 3D Gantt chart or line of balance for a few activities for typical floors. That is from posts blower to 16 fluid. Next tutorial, we will add few more activities to our existing line of balance chart, but we will use different sets of floors. Thank you. 10. Finish 3D Gantt charts and Read the data: Hello. In last tutorial, we created a 3D Gantt chart for a few activities from first floor or to 16 floor. This tutorial, we will create a line of balance for a few more activities, but we will use different sets of floors. Let's add another activity of external facade. Here we will take finish date of facade from the risk level. So click on the chart area, click on Select Data. Click on Add. Under series name Value box, select the cell which contains name of activity, external facade. In X value box. Those select Finish date for first floor, insert coma, then finish date for terrace level. Now in series y-value box, select the silicon turning first Flow Label, insert coma, then silicon containing Davis fluid label. Click Okay. You will find another activity added to our 3D Gantt chart. Starting from first floor tilts there is fluid. Select the series under fill in-line, change line color to dark red. Change dashed type to square a dot. Click on marker under Fill, select dark red. Under Barter. Select solid line, dark red. Go to Chart Elements. Click on Data Labels. Most Select Data Labels under Label, option, chick, x-values, and uncheck y-values. Click on Size and Properties. Under alignment, takes direction, click on, rotate, alt-text to 70 degree. Select Data Label, change their field to dark red. Change foreign color to white. Make the font bold. Reduce the foreign size. Let's add another series of elevator. Let's observe elevated rates, elevator activities taken from leaf machine room bill last basement. Here we need to select the cells corresponding to the label of best men and lift machine room. Right-click on the chart area. Click on Select Data, click on Add under the series name Value box. Select the cell which contains name of the activity elevator. In x-value box, we will select date for elevators. Select Finish date for basement to insert a comma. Select Finish date for lip machine room top. Similarly in cities y-value box select cell containing the floor level of basement to insert coma. Then select the cell containing level of top of lip Machine Room. Click Okay. Here we will find another line created but for different set of floors. Now select the series under fill in line, change line color to dark blue. Change batch type two square dot. Click on mocker under Fill, select dark blue. Under Barter. Select solid line and dark blue color. Let's select the series, go-to chart elements and click on Select Data Labels. More select data labels under the label option. Chick, x-values are uncheck y-values. Select Label Position, right. Change the data field to dark blue. Change foreign color to white. Make the font bold. Reduce the font size. Let's add another series for finishing dates for each floor. Here, we will add final finishing dates for each flow are same as RCC, but only for office floors. Right-click on the chart area. Click on Select Data. Click on Add under series name var lib box. Select the sale which contain name of activity finishing x x-value box. Select all finish dates starting from first floor to 16. Fluent. In cities y-value box. Select cells containing all fluid levels from first floor to 16 floor level. Click Okay, you will find another line added. Select the series under fill and line, change line color to dark red. Click on the marker under field, select dark red. Under Barter, select solid line, dark red. Go to Chart Elements. Click on Data Labels. Select the data labels. Under Label Options. Chick x-values and uncheck y-values. Select Label Position, right. Change foreign color to dark red. Make the font bold, reduce the font size. Our 3D Gantt chart online or balance chart is ready. Here we can easily absorb that lines are not crossing what it means productivity rates are maintained in such a way that all internal finishing activities are performing uninterruptedly. When you take mouse to any of the desktop wine, it gives you activity name and finish date for that activity at that floor, which makes it easy to read. A project manager and project team can easily analyze the information and can easily make strategic decisions regarding contact or finalization procurement, managing funds, or workflow. Lob charts are invaluable in review of any schedule. Pictorial and graphical representation, enhanced visualization and understanding. As everything is created using Excel charts, you can easily change the dates and can see the effect immediately. You can experiment a lot with different strategies. You can easily compare them, evaluate them, and choose the best among. It gives them more control over the future processes of the project. Use it often and it will certainly give you wonderful results. Thank you very much. 11. Prepare Linear or Align based schedule: Hello. We discussed earlier that line of balance is suitable for effectively scheduling the projects which contain the repetitive work or activities. Project involving repetitive activities can be grouped tasks, pointing best products and distance best projects. In our earlier tutorial sweep created line of balance Per Point best projects. For Distance-Based projects or alignment in this project, activities are performed continuously along the length of horizontal alignment of the project. Highways, railroads, panels, and pipelines are examples of such projects. The linear scaling method is very useful and informative tool for scheduling alignment and best products. Linear schedule is developed with time on the y-axis and distance on x axis. We will try to deliver schedule for a pipeline lane project. Biplane projects in wall activities continuous along the horizontal alignment, such as grabbing, stringing, bending, welding, coding, etc. Typically, the same crew repeats each of these activities from one end of the project to the other. Often the only distinguishing feature for this linear type activities is the rate of progress. For pipeline construction projects. The sequence of activities is usually not the issue of concern. Instead, by issue is accurately assessing and achieving the optimum production rate necessary for timely completion. Hence, we will plot linear chart for the review. Basic schedule is prepared in Microsoft Project and balancing is done later on. Mass production rates. And to ensure continuous work friend using linear charts. In this type of scheduling, there is a slight difference in the layout. In linear scheduling, we take distance on x-axis and dates on the y-axis. Please refer the data. Here we have a schedule prepared for a stretch between Wednesday at a 100 meters and 4900 meters. Leftmost column contains activities. The entire pipeline work is broken into three stages. Stage one, stage two, stage three. Then we start and finish dates for each activity and for each stage in subsequent columns. I specifically put Janet about dates and column headers about change. In this arrangement makes creating linear scaling chart surprisingly simple and fast. We will begin preparing the chart. Select entire data range including activity names, Genesis, start, finish dates. Go to Insert tab. Charts, group, insert scatter with straight lines and markers. You will find a chart if we look a little different, but don't worry, we will format it. Increase the size of the chart. Right-click on the chart area and click on Select Data. Select Data Source dialog box will appear. Now we'll just do one simple thing. Click on switch row, column. Mousey, we have activities and category, and distance on horizontal axis labels. Click Okay. You will find a graph created in this few minutes. We will just how to format the chart. Select the chart. Under design. Select Style Six. Most select y-axis. Under Format Axis task been in access option enter minimum value as 20 February 18. Maximum. No emulating. In units. Enter 30 phi you in measure 30.5 minor as well. Under tick marks. For measure pipe, select outside in number. Under Category. Select Date, and select bypass. Month and year. Most select x-axis. Under Format Axis pass pin. Emax is option. Minimum value as friendly 700, and maximum 5 thousand. In units enter 100 in measure and a 100 in myelin. Under tick marks. Outside for measured pipe and outside for minor type as well. Selected regions. Under lesions options. Untick showed the lesion without overlap in the chart. Mood the lesions just about the y-axis values. Resize it if needed. Select plot area and move it all the way up. Click on Chart Title. Select the chart. Under Chart Elements. Check data labels. You will find start and finish dates added near data point for every activity. For every section. I have already inserted the image in the worksheet. Now we will drag the image and reposition it. He can resize the image and resize the chart. That the stages matches exactly with the chart. So our linear scaling chart is ready. In this method, the progression of each of these activities in the relation to location and time is plotted on the chart. Project bim can easily determine activities in progress at particular location. Activity production rates represented by slopes of the line and scheduling conflicts do to work location constraints. The convenience flow of work along the alignment becomes a driving factor in scheduling linear products of this type. Most continuous resource usage is critical in establishing the project mutation. The use of graphics and visual into Tunis provided by separate activity pipes and labeled project managers, schedulers, owners and construction personal to better visualize the plan of action and more easily communicate the plan to everyone involved in the project. Thank you very much. 12. Prepare LOB for a Skyscraper: Hello, welcome back. Earlier we created a 3D timeline or line of balance for a commercial project. In this tutorial, we will create a line of balance for a skyscraper. Moreover, along with creating a line or balance, we will learn few additional tricks and techniques which will enhance our LOB charts to a great degree. Let's see the section of the high-rise building. I have already inserted image. We will develop a lobby using this section or this image only. Let's refer the data. In the Excel sheet. Dates are extracted from Microsoft Project schedule. First few columns contain floor demarcations and respect to Florida levels. Next, column headers contain activity and finish date for floor under consideration. Here we will learn how to show bars in line no balance charts, how to create symbol milestones, and how to add few important procurement items in our LOB chart, which will help immensely in the reviewing the schedule and taking strategic decisions. Unlike previous tutorials, we will start working directly on the image. Let's begin creating the chart. First, we will enter the chart. Go to Insert tab charged group. Under Insert Scatter or bubble chart, select scatter with straight lines and markers. We will see a scatter graph created. Let's increase the size of the chart. Here, we will insert RCC activity in the form of bar charts. Right-click on Chart Area. Click on Select Data. Under the legend entries. Click on Add. We will see an edit series dialog box. Didn't see his name value box. Just type RCC. In x-value box. Select RCC start dates. In series y-value box, select Florida labels and click, Okay. Our chart with one series is ready. We will format Chart Elements one-by-one. First, select Y-axis. Right-click. Click on Format Axis. Under Axis Options type minus 70 in minimum. Remember we have fluid level as minus 29.89 in maximum pipe 1050. We don't want to display y-axis as we already how buildings section for the reference. Hence, go-to chart elements under excess option, unchecked vertical axis. Let's format x-axis now. In minimum, enter three, Juliet been in maximum Phi u January 22. Interim measure units as penalty point for you. Minor. Third, peak wind for you. God took tick marks. Select outside for major type. Go to labels. Select Label, Position low. Go-to number. In Category. Select Date, and type as month and year. Go to Size and Properties under alignment. Thanks direction. Select, Rotate alt text to 70 degrees. Make it board. Increase the size and change the color to blue. Click on the plot area. And the resize it so that x-axis labels are properly visible. Click on the chart area. From Format tab. Remove fill and outline. Let's go to Format tab. Under the shear fill. Select no fill and no outline. Under Shape outline. Select the chart. And the remote horizontal grid lines from chart elements. So here we plotted one series. In the next tutorial, we will learn how to show activities in the form of a bar chart. Thank you. 13. 3D Gantt chart for the Skyscraper: Hello, Welcome back. In the last tutorial, we plot in one series. In this tutorial, we will match data points with the section and format the series to create bar chart. First, select plot area and take it all the way to the top of the chart area. Select the chart area and address it. Such a way that super data is data pipeline matches with the dotted line of the same. You can invariable adjust the plot area from the bottom. Also. Great. Now we will format the series as we want to show bar charts. Select the series. Under Freeland line option, select no line. Click on the marker option and check none. Now the question is how to show bars representing the duration for each floor under RCC? What can you think of a possible solution? I will give you a hint. Era bars will be very handy here. Can you think? Okay, let's start. We will insert error bars with the series still selected. Go to Chart Elements. Under error bars. Click on More options. For error bar options. Select series are CC-BY error bars. Here we don't want why edit the bars? Hence under Edit about options. Select plus no cap and fixed value as 0. Select series RCC x error bars, direction select plus. In style, no cap. Select Custom. Click on specify value. A custom error bar dialog box will appear. In positive error value. Select cell range containing duration of each activity for RCC work. Under Freeland line option. Underline, select solid line. Red color. Increase the width. Three points under shadows. Select opposite diagonal bottom right. Now let's add data labels, but in a different fashion. We will try to show name of the floor and finish it. Now if you remember, we already selected start date, but here we are trying to show finished it. Hence select the series from Chart Elements. Click on Data Labels. You will find data labels added. Now we want to show activity finish dates behind the bar chart. We need to insert. One column. Insert a column. Great. Now drag the formula. Go to our chart. Select data labels. Under Label Options. Click on value from cells. Data Label Range, dialogue box will appear. Select cell range from column we have just inserted. Click Okay. Goto label position. Click on left. You will find data labels inserted with floor and finished it. Select Beta labels, reduce font size. Now let's say we wanted to focus few important floors which we can use as our milestones for starting subsequent activities and material ordering. Hence, select Beta label for the first floor. From home. Change the field to pan, change foreign color to read. Make it bold. Select tenth floor. Change the field to tan. J's the foreign color to red. Make it bold. Select 28th floor. Change the field to pan and change the font color to red. Make it bold. Select 13th floor. Change the fill to change the font color to red. Make it bold. Select 14th floor. Change the fill color to change the font color to red. Make it bold to select service floor, change the field to change the foreign color to red, make it bold. It is done. We have inserted one series. So in this tutorial we enter RCC activity, where we short duration in the form of bar charts. Remember we use simple and formatting techniques. Moreover, we added different formatting for some important floors, which we can use as base for focusing subsequent processes. What do we did? We selected the cities and enter data as usual. But then we hide the line and marker. Then we use the error bars to show activity duration and kept error value equal to duration of that activity. Here error bars played important role for showing the duration of that particular activity at that floor level. Just practice it a few more times and you will be very good at it. We will continue with more fun in next tutorial. Thank you. 14. Add Dynamic milestones : Hello, Welcome back. Here we will insert few activities, mainly from project preliminaries, but in a different fashion. Loe charts contain balanced lines of activities, but we can definitely add additional information on the same chart to improve visualization for decision-making and review purpose. We will insert few activities in the form of milestones. We created RCC series first as we wanted to set the entire timeline range and Chart Area. Right-click on the chart area. Click on Select Data. Click on Add and Edit series dialog box will appear in series name value box just pipe preliminaries. In x-value box. Select dates from rock and cutting period tower crane installation. Here we will have to do a horizontal selection. By now, you must tell we realized that whether you selected horizontally or vertically, if you end up proper values in X value box and white box, that you can easily plot the graph and show any kind of the information you want. Now we'll plot these dates in the form of milestones about x-axis. Now how much M0 we want to show values to be plotted will come under y-value box. Height of the buildings around 950 meters. So we will plot data labels at 150 so that labels are easily visible in y-value box. Now here is another trick. We have to manually enter the value, insert 150. But remember, we meet to enter it seven times as we go and save and activities and projects, preliminaries. Hence enter 157 times separated by comma. Click. Okay. I want a chart with one series is ready. It's not properly visible right now, but don't worry. From task pane, select series preliminaries. No go-to chart elements, and check data labels. Select data labels. Right-click, click on Format Data Labels. Here we want to show activity and finished it. Hence, click on value from cells. In select Data Label, range of value box, select column header from rock anchoring to tower clean. Click Okay. Now to show the dates. Check x-values and uncheck y-values. Click on size and properties are under alignment. Select tags direction, rotate or takes to 70 degrees. Now we will our activity name and finished it visible. Let's add some more formatting. From task pane select series, preliminaries. Go to Chart Elements. Check error bar, checkbox. You will find error bars added to this series. From task pane select series preliminaries why error bars were articulated about select minus no cap. Enter a 100% in value of an error amount. You will find a robust added. Click on Freeland line. Select orange color, increased to 1. Select bash type as dash, select, etc. Bars from task been under a lot about options. Select both. Select no cap, enter fixed value. As we help plotted few activities with finish dates here. Again, we will highlight few important activities using different format. Select Beta label, legal clearance by double-clicking. Make it bold. Increase the foreign size. Change the fill to change the font color to red. Select Beta labeled tower, crane. Make, make it board. Increase the foreign size. Change to the field to pan. Change the font color to red. Here we have used different formatting options and short important dates in the form of milestones only. Instead of checking the data in tables and MSB schedule, we can use LOB charts to plot the same information and review it. It gives a clear idea of what is to happen and when it is to happen. We can plan our future processes very efficiently. Thanks a lot. We will continue in the next tutorial. 15. How to show dates for any specific level : Hello. In this tutorial, we will add few activities. Let's add activity, civil work. Right-click on the chart area. Click on Select Data. Click on Add. Under the series name mailbox. Select the cell which contains name of the activity, civil work. Select finished it for first floor, inset coma. Select Finish date for 47th floor. Let's move to cities via LU box. Select the cell containing first floor level, insert coma. Then select the cell containing 47 Florida level. In the past pane. Select series, civil work. Under fill in line. Select solid line. Select line color, dark green. Click on mocker under marker option. Select, automatic. Under Fill. Select and dark green color. Under border, select solid line. Dark green color. Now go to Chart Elements and check beta labels. Select the data labels under Label option, chick, series name. Jake, x-value, uncheck y-value. Select labeled position below. Click on Size and Properties. Under alignment. X-direction, click on rotate, text to 70 degrees. Change. Feel too dark green. And change foreign color to white. Make the font bold. Let's add another activity for services work. Right-click on the chart area. Click on Select Data. Click on Add. Under a series named wildly box. Select the cell which contains name of the activity services, will go to Series X value box. Select Finish date for first floor, inset coma. Select Finish date for 47th floor. Again, insert coma. Select Finish date for super dangerous. Let's move to cities via ReLu box. No, remember we entered three values in series X will loot box. We need to enter floor levels For three floors here. Select the cell containing first floor level, insert coma, 47th floor, insert coma, and superficialis floor level. Select the series under fill in line, select solid line line color. But Apple under marker option, select Automatic. Click on marker. Under field, select purple. Under Barbara, select automatic. No go-to chart elements. And check beta labels. Select the data labels. Under Label option, chick, series name. Check x-value had uncheck y-value. Select Label Position below. Go-to size and properties are under alignment. Eggs, direction, click on rotate all takes to 70 degrees. Select Data Labels. Change their field to purple, change foreign color to white, and make the font bold. Let's add another activity for external facade work. Right-click on the chart ADR, click on Select Data. Click on Add. Citizen named Wally box. Select the cell which contains the name of the activity external facade. Click inside cities x value box. Select finished it for the first floor, insert coma, and select the remaining cell range containing finish dates. Let's move to cities via Webex. Click inside cities y-value box. Select first floor level. Insert coma. Then select cell range containing floor levels for which finish dates are captured in x-value box. Here I'm using multiple combinations in X value box. And why? Well, Lubac so that you can easily get hold of it. Select the series external facade. Under fill in-line, select solid line. Select line color, orange. Under market option. Select Automatic. Click on marker under Fill. Select orange. Under Barbara. Select automatic. No go-to chart elements. And check data labels. Select data labels. Under Label option, chick series name. Check x-value or uncheck y-value. Select Label Position below. Click on Size and Properties. That alignment begs direction. Click on the rotate all it takes to 70 degrees. Change, feel too orange. Change foreign color to white. Make the foreign board. In this tutorial, we have added few activities. In next tutorial we will try to add few dates for important material shipment. So that in a single sheet, we will try to represent as much more information as possible in different format. Thank you very much. 16. How to show procurement dates on the same chart: Hello, Welcome back. In this tutorial, we will add another series and we will try to show important material shipment. Let's add another activity for a handler. Right-click on the chart area. Click on Select Data. Click on Add. Under the series name Value box. Select the cell which contains name of the activity hand lower. Click inside series X value box, and select Finish date for first floor, insert coma, and select Finish date for 47th floor. Let's move to cities via LU box. Select first floor level, insert coma, and select 47th floor level. Select the series handover. Under Freeland line, select solid line. Select line color, light green. Marker option. Select Automatic. Click on marker. Under field, select light green, border, select light green. Go to Chart Elements and check data labels. Know Select Data Labels. Under Label option check series name. Check x-value, and uncheck y-value. Select Label Position Below. Click on Size and the properties under alignment, x-direction. Click on the rotate alt text to 70 degrees. Select Data Label. Change their field to light green. Change foreign color to white. Make the font bold. We are learning here what all possibilities this simple technique has, which gives a greater control to project managers over the entire project net processes. Let's insert few materials ship mandates. Right-click on the chart area. Click on Select Data. Under the legend entries, click on add. In series name value box. Just type procurement. In x-value box. Select dates of procurement items will be held. Now we will plot these dates in the form of milestones about x-axis, y value box. Let's say we want first imported tiny ship men at tenth floor level, the net when deep floor level, then 30th floor level, elevators or lifts around roof level. And transform was at podium one level. We need to select respect to Florida labels separated by comma. Select tenth floor level. Insert coma. When Pete Florida level, insert coma. 30 floor level, insert coma. Roof level, insert coma and podium one-level. Click OK. So on imported items are plotted on the graph. Now we need to format them. Click on Data Labels. Let's select procurement series from the task pane. Under fill in-line go-to marker. Under marker option. Select Built-in go-to type. Frog, drop-down menu, select diamond chip. Increase the size to seven. Select orange field. Go to Chart Elements. Check data labels. Most Select Data Labels. Go to Label Options. Here we want to show name of the activity and material delivery dates. Hence, click on value from sales. In select Beta label range of value box, select all procurement items and click Okay. Now too short dates. Check x-values and uncheck y-values. Take labial position to write. Change the color to blue. Make them bold. Make them italic. Go to Format tab in charter schools. Civic outline, color to white background, one, darker 50 per cent. And select dashed outline. We will have activity name and finished it. Visible. Luby charts are ready in a single chilled. We tried to create the complete picture of important project activities. And that took chronologically. Here we have bar charts, milestones, and line charts. Charts are tremendously powerful. Just imagine your sheet is like a blank canvas. Every point on the sheet is an intersection of height and y-axis. And it's a real-time position on the timeline, which is on x-axis. Moreover, it's all dynamic. The moment you change the date or the height, repositions itself. Lob charts gives you a clear picture of your project. It's a great way to visualize the project schedule. The chart style you went to focus and what to focus weekend easily prioritize our efforts and resources by identifying criticality of the project. You can analyze almost everything using simple sheet. It immensely help a project manager to take accurate decisions. Lob charts. I like seeing a broader picture by looking at vital aspect of the project schedule. I am absolutely sure it will help you go along way because it stimulates ultimately to thinking. Once you plot it on a Louis charts, you will start reviewing the schedule in a more creative way. Please reward in case of any queries or suggestions. Suggestions, feedbacks are always welcome. Thank you very much. 17. Line of Balance - Basics of Balancing: Project consists of a number of activities happening in a sequential manner. Every activity has different processing time or production rates. In this production variables continuously Africa the schedule in a way or rather. The line of balance technique is a scheduling method that allows balancing of the operations are production rates of different activities such that each act they would be performs quite efficiently. In this tutorial, we will see how to use balancing techniques so that This can be performed efficiently without any interruption. Let's refer the data. Here are the dates off to activities waterproofing and tiling. It takes 15 days to complete waterproofing work of one fluid. Whereas it takes plane this to complete piling work of one floor. This speed we can say waterproofing has productivity of two floors per month. Dialing has productivity of three floors. Pearlman. We'll start creating the lines. We will insert graph. Go to Insert tab, Charts, group, insert scatter with straight lines and markers. Blank chart will be created. Right-click on the chart. We will get contextual menus. Click on Select Data and select the tau Soyuz dialog box will appear. Click on Add and we will add waterproofing activity. Series name Value box, select column header waterproofing. In x-value box, select waterproofing, finish dates. And in Y value box, select floors. Click Okay. No first line is added. Again, click on Add. See these named Value box. Select the cell containing tiling. In x-value box. Select tiling dates. In YAML Lu box, select respect to floors. Click Okay. You will find two lines added to the graph. Let's do some formatting. Select x-axis. Under minimum, fire, March 18, maximum type fire November 18. Measure units and pursuing under number, select Date, category, pipe as bid and MAN. That is 14 March in Size and Properties. Select text direction. As it rotates, takes two to 70 degrees. Select the plot area and resize it. Most select waterproofing series. Board to Charlie limits and select Data Labels. Select the data labels. Under Label Options, chick, x-value and uncheck y-value. Select tiling series. Go to Chart Elements and CIC data label checkbox. Select labels under Label Options, chick, x-values, and uncheck y-value. Here you will see two intersecting lines. As filing succeeds, waterproofing with higher productivity rate, there are chances that manpower may remain idle. Hip proper attention is not paid to the high productivity rate of piling work. When we plot the graph, we realize there is a crossover, which should always be a widely because it is the point where succeeding activity has two hard to let the preceding activity finish. We will continue the same in the next tutorial. Thank you. 18. How to Balance Activities?: Hello, welcome back. We will continue from where we had left. When we plot the graph, we realize there is a crossover which should always be avoided. Because it is the point where succeeding activity has two hard to lead the preceding activity finish in schedule. Actually there won't be any crossover as both the activities will be linked by finish-to-start relationship. But the tiling we'll hard at every floor to accommodate for process time of waterproofing. Here I will add another series, the dates of which are taken from Microsoft Project schedule. Here I added another series with start, finished it so that you can understand what happens in Microsoft Project schedule. How to add this series that we will learn in next tutorial. Initial floors, if you will absorb the line, you will see activity for the next floor commencing as soon as activity for preceding flow gets completed. Merton later on you will absorb some gap or lag. It means styling for the next flow or current comments at suny, styling of previous fluid gets completed. But it will start with some gap or lag if you are absorbed. Third floor tiling is finishing on 21st off me. But fourth floor tiling starts on 26th May. This is because preceding activity or predecessor for that floor, which is the waterproofing, is not completed by that time. Same pattern will be repeated for every floor. At every floor tiling manpower will remain idle for some period of time to accommodate for more processing time of its predecessor, that is water proofing. To work on this problem, we will have to delay the start of tiling in such a way that it performs to its full potential without delaying the project schedule. We had to eliminate the crossover in the schedule and in actual condition also. Now, our aim here is to complete the tiling work uninterruptedly. Hence, in this situation we need to delay startup succeeding activity that is dialing, in our case. Select dialing in Format Data Series past pin, chick on freelance online. Change line bashed pipe to round dot. We will add another activity piling be. Here. We have balanced the tiling dates. Let's add the series and right-click on the chart. And click on Select Data. Select Data Source dialog box will appear. Click on Add under series name. Select tiling be. In series x-value box. Select dates from first floor and pen floor separated by comma series y-value box. Select cells from first floor and ten floor separated by comma. Select this series. Go to Chart Elements and check data labels. Select data labels under Label Options, chick, x-value, and uncheck y-value. You will see tiling actor would be added with revised it. Now there is no crossover, which means filing can be completed without any interruption. Here we are held in combination of line of balance technique and Microsoft project scheduling. This type of scheduling enhances visual capabilities of the standard scheduling practices. It helps project managers and project team to better understand the effect of production variables on construction process and to manage the processes and resources quite efficiently. Next tutorial, we will see how to balance a set of activities. Thank you very much.